Projects

Check which standards are currently under development.
Use the opportunity to review a standard before release.

Ongoing Projects

The following projects are currently under development. Click on the links of each project for more details.

FILTER RESULTS
FILTER

Study Project ASAM MCD-2 MC for Motorcycle Purposes

Project Number
S_2020_16
Project Type
Study Project
Domain
Measurement & Calibration
Project Start
Oct 2020
Public Review
none
Project End
Mar 2022
Project Release
none
The purpose of this project is evaluate the utilization of ASAM MCD-2 MC in the motorcycle industry. Several ASAM members active in the motorcycle industry will collaborate in this project, share their ideas and bring in their requirements. If considered useful, this group will submit requirements for the further development of ASAM MCD-2 MC.

Participating Companies
Honda R&D Co., Ltd Automobile R&D Center, YAMAHA MOTOR CO., LTD., Accurate Technologies Inc., DENSO Corporation, dSPACE GmbH, ETAS GmbH, Keihin Corporation, Vector Informatik GmbH


LEARN MORE

ASAM OpenDRIVE Maintenance

Project Number
P_2020_15
Domain
Simulation
Project Type
Revision Version Dev.
Enroll by
Nov 27, 2020
Project Start
Dec 2020
Project End
Apr 2021
Release
May 2021
As a result of the transfer of OpenDRIVE 1.5 to ASAM, ASAM OpenDRIVE 1.6.0 was released in March 2020. In the Transfer project not all errors and ambiguities could be fixed. After 8 months of being in the field ASAM has received some feedback on ASAM OpenDRIVE 1.6.0. The goal of the project is to clear the ambiguities and fix the found errors in the specification.

Participating Companies
3D Mapping Solutions GmbH, BMW AG, CRUDEN B.V., Daimler AG, dSPACE GmbH, Five, Porsche AG, Vector Informatik GmbH, VIRES Simulationstechnologie GmbH, virtualcitySYSTEMS GmbH, VTI - Swedish National Road and Transport Research Institute, SpringCloud


LEARN MORE

ASAM iLinkRT Maintenance

Project Number
P_2020_14
Domain
Test Automation
Project Type
Revision Version Dev.
Enroll by
Dec 15, 2020
Project Start
Mar 2021
Project End
Jun 2022
Release
Jul 2022
ASAM iLinkRT is a High-Speed Automation access protocol for MC-Servers. ASAM iLinkRT V3.0.0. will be released in Nov 2020. Due to the large number of new, supported capabilities and the fact that this protocol is positioned as the successor of ASAP 3, it is expected to be widely used in the market. Any problems, difficulties in understanding and possible ambiguities that may arise shall be solved within this maintenance project. Additional cross tests shall be carried out with real products from participating companies to identify bugs and change requests.

Participating Companies
Arrival Ltd., AVL LIST GMBH, dSPACE GmbH, ETAS GmbH, Kristl, Seibt & Co GmbH, RA Consulting GmbH, Vector Informatik GmbH, We4Data GmbH


LEARN MORE

ASAM Test Specification Study Project

Project Number
S_2020_13
Domain
Simulation
Project Type
Study Project
Kick-off Meeting
Enroll by
Nov 30, 2020
Project Start
Dec 2020
Public Review
Mar 2021
Project End
Q2 / 2021
This study project shall examine the relevant use cases for scenario-based testing in more detail with the goal to identify all relevant standards, potential workflows and their variants, and the overall interplay between those parts to form a cohesive whole. This analysis should in the end lead to a documented set of overall use cases for scenario-based testing, a set of potential workflows implementing those, together with identified roles, standards and their application. Additionally any identified gaps in the workflows shall be characterized, leading to the identification of potentially needed additions to existing standards, or even the need for completely new standards. Requirements for those standards or additions shall be collected and documented.

Participating Companies
Advanced Data Controls Corp., Advanced Laboratory on Embedded Systems, AKKA GmbH & Co. KGaA, Altran Deutschland S.A.S.&Co.KG, Applied Intuition Inc., AUDI AG, Automotive Data of China (Tianjin) Co., Ltd, AVL LIST GMBH, BMW AG, BTC Embedded Systems AG, Cognata Ltd., Daimler AG, Deutsches Zentrum für Luft- und Raumfahrt e. V., Driving Simulation Association, dSPACE GmbH, Edge Case Research, emotive GmbH & Co. KG, FEV Software and Testing Solutions GmbH, Foretellix Ltd., HORIBA, iASYS Technology Solutions Pvt. Ltd., Kontrol GmbH, MathWorks, Inc., MicroNova AG, Mindmotiv GmbH, NVIDIA, Opel Automobile GmbH, Peak Solution GmbH, PikeTec GmbH, PMSF IT Consulting Pierre R. Mai, RA Consulting GmbH, Robert Bosch GmbH, Technische Hochschule Köln, TraceTronic GmbH, Vector Informatik GmbH, Vicomtech, VIRES Simulationstechnologie GmbH, WMG University of Warwick, ZF Friedrichshafen AG, AstaZero, Coventry University, imbus, Nardò Technical Center, Spring Cloud, TNO


LEARN MORE

ASAM OpenLABEL V1.0.0

Project Number
P_2020_12
Project Type
New Standard Dev.
Domain
Simulation
Concept Paper
Proposal Workshop
Enroll by
Project Start
Dec 2020
Public Review
Sep 2021
Project End
Nov 2021
Release
Nov 2021
The ASAM OpenLABEL Concept work group has developed a concept on how a future standard for labeling objects and scenarios could look like. It covered the aspects labeling methodology, labeling structure and file format. It is now time to convert the concept into a standard.

Participating Companies
Advanced Data Controls Corp., AKKA GmbH & Co. KGaA, Altran Deutschland S.A.S.&Co.KG, Annotell AB, Ansys, Inc., Automotive Data of China (Tianjin) Co., Ltd, Dataloop, Deepen AI, Deutsches Zentrum für Luft- und Raumfahrt e. V., Five, iASYS Technology Solutions Pvt. Ltd., LiangDao GmbH, Peak Solution GmbH, RWTH Aachen, SAIC Motor Corporation Ltd., Tata Consultancy Services Pvt. Ltd, understandAI GmbH, UniqueSec AB, Vicomtech, WMG University of Warwick, AI3DENSORY, Caliber Data Labs, Incenda AI GmbH, Spring Cloud


LEARN MORE
Stay informed! Subscribe to our Newsletter.
Subscribe